|
|
|
Singapore Siwer Imp.&Exp. Co.,Ltd
|
|
| |
|
|
|
|

|
|
|
Model Number |
Fe 64.5% |
|
In order for your company to do business we require that the Buyer submits an LOI (Letter of Intent with S
|
|
oft Probe Authorization) and submits an RWA (Ready Willing and Able, emitted by Buyer's bank), or BCL –
|
|
Bank Capability Letter.
我们要求买方出具LOI和准备求购能力书(RWA)或者BCL
|
|
When the LOI and either of the documents above are returned together then we may proceed with FCO.
|
|
Buyers’ Bank should be Strictly Top 25 USA / UK / European Bank Or HSBC Bank, Hong Kong. None Other B
|
|
Commodity : IRON ORE Fe 64.5% rejection 62%, size 0-10 mm 货物:64.5%的铁矿低于62%拒收
|
|
Seller : Dynamic Alternatives Group Inc. C/O Brazilian Mine, Brazil
|
|
Quantity : 150,000 MT/Month minimum to 1,000,000MT/Month 数量:150,000-1,000,000公吨/月
|
|
(in multiples of 150,000 MT)
|
|
Contract Length: 12 monthly shipments minimum with extensions 最少12个月的合同
|
|
Loading Port : of Victoria, Tubarao, MPB, Brazil or at seller's choice. 装货港:维多利亚港、图巴朗、和其他巴西的主要港口
|
|
Destination Port: CIF Any safe seaport People’s Republic of China 目的港:CIF中国
|
|
Price : US$ 165/MT CIF Any safe seaport People’s Republic of China.
价格:165公吨CIF中国港
|
|
Inspection: SGS/CIQ/CCIC to determine quality & quantity at the loading port. Only SGS inspection cost t
|
|
o be borne by the Seller at the loading port. CIQ/CCIC, if requested by the Buyer, t
|
|
he cost to be borne by the Buyer.
|
|
Performance Bond: After received acceptable payment instrument from Buyer, the Seller will issue a 2% P
|
|
erformance Bond of the value of the LC in the form of Corporate Performance Bon
|
|
d to be issued by seller backed by SBLC.
|
|
检查:SGS/CIQ/CCIC 在装货港的数量和质量检验。卖方只愿支付装货港的SGS检验费。如果买方要求CIQ和CCIC检测费则由买方出。
|
|
履约保证:在收到买方可接受的支付方式后 ,卖方将出具2%的履约保证。
|
|
Basis of Delivery: In shipments of minimum 150,000 MT (+/-5%). The shipment will be
|
|
arranged by seller for delivery of material within 45 days after receipt of all required documents.
|
|
Initial Documents: LOI (Letter of Intent with Soft Probe Authorization) or RWA (Ready
|
|
Willing and Able, emitted by Buyer's bank), BCL – Bank Capability Letter.
|
|
Fe 64.5 % Rejection below 62 %
|
|
Al2O3 0.7 % Rejection above 2.00 %
|
|
SiO2 3.0 % Rejection above 4.00 %
|
|
PHYSICAL CHARACTERISTICS:
|
|
Free moisture at 105 degrees centigrade 8.00%
|
|
We will accept payment by any one of the following methods :
|
|
1) By extended one year interest free term, provided one of the two following security arrangements are
|
|
complied with. Term (maturity date) of SBLC or BG is to be for one year and
|
|
forty-five days from date of issue. Delivery of product/commodity begins as per
|
|
buy/sell contract 30-45 days and continues as per agreed schedule in the buy/sell
|
|
a. By irrevocable, unconditional, unencumbered, Standby Letter of Credit (SBLC) in favor of the Seller,
|
|
issued or confirmed by a top 100 world bank, or alternative bank approved by
|
|
Seller, for full contract value, due one year and forty five days from the date of
|
|
issue. SBLC to be in conformity with the verbiage per attached Addendum 'B'.
|
|
2) Bank Guarantee or SBLC for preferably three months supply of Product. Said payment instrument is to
|
|
be used by us for the last three months of supply of the first (12) twelve months
|
|
buy/sell contract and/or as security for default or buyer or buyer's bank, buy/sell
|
|
contract and payment by DRLC or SWIFT wire transfer per shipment against
|
|
relevant shipping documents.
|
|
If and as when necessary the following provision may be added in the FCO and the Buy/Sell contract :
|
|
3) Seller agrees to pay by way of SWIFT wire transfer 100% of the face value of the Bank Instrument, as
|
|
received, verified and accepted, plus 5% penalty, totaling 105%, as full settlement
|
|
within 60-65 days from the receipt, verification and acceptance of the Bank
|
|
Instrument by our Bankers and Ourselves, in the event of non delivery for any
|
|
reason whatsoever, including force majeure.
|
|
|
|
|
| |
|
|
|